Love's #359 Remodel Emerson, GA

Remodel

Status

Bidding Closed

Bid Date 10/1/24 4:00pm

Company

...

Location

150 Old Allatoona Rd SE Emerson, GA 30121

Brief Project Description: Remodel of Existing Love Gas Station. Will be completed while store stays open. All barriers to section off scope will need to be modular. Any Disruptive or Loud scope will need to be Handled as Night Work. Please Refer to Subway Plans for Related Scope

2. Site Construction
2-b Demolition (Interior or Exterior) Yes - Please Include Sawcuts for Utilities/Please Include Modular Type Noise and Dust Barriers for Demo Work (No Plastic Sheets)/Please See SWA132 for Subway Specific Scope

3. Concrete
3-a Soil Treatment Yes
3-b Concrete Material Yes, 3000/4000 PSI / Estimated CY:  250
3-c Concrete Labor Yes
3-d Concrete Turnkey Proposals Yes - Please Include Liner at Shower Slabs per A401/Please Include Perimeter Insulation
3-e Concrete Pumping Yes
3-f Stone / Aggregate Yes, #57 Stone / Estimated tons: 500
3-g Rebar / Wire Mesh Yes

4. Masonry
4-a Brick Material Yes
4-b Block Material Yes
4-c Masonry Accessories Yes
4-d Masonry Labor Yes
4-e Masonry Turnkey Yes - Please Include Interior Thin Brick Walls
4-f Nichiha Panels Material Yes
4-g Nichiha Panel Install Yes

5. Metals
5-c Building Steel Turnkey Yes - Please Include Channels for Floating Ceilings

6. Carpentry
6-a FRP Material Yes
6-b FRP Install Yes
6-c Cabinetry Yes - Self Checkout Millwork
6-d Countertops Yes - Solid Surface Counters
6-h Kitchen Equipment (Install Only) Yes - Install New and Relocate Existing per A132/A133

7. Thermal and Moisture Protection
7-a Roofing - TPO, Duralast, Flat Roof Yes - 60 MIL PVC Roof Membrane (R-40)/Please Include Penetrations
7-e ACM Panels Yes
7-f Stucco or EFIS Yes
7-h Batt Insulation Yes
7-k Caulking Yes

8. Doors and Windows
8-a Doors, Frames, Hardware Yes
8-b Doors, Frames, Hardware Install Yes
8-e Storefront & Glass Yes

9. Finishes
9-a Acoustical Yes
9-b Drywall & Metal Studs Yes; please include wood blocking in your quote/Please Include Densglass Gold, Rigid Insulation and Tyvek Behind Brick and Nichiha/Please Include Install for Slat Walls, Various Wallcoverings and Laminate at Celing and Soffit Areas/Please Include Modular Barriers to Section off Working Areas (No Plastic Sheets)/Please Include Nightwork for Loud or Large Disruptive Scopes
9-e Flooring (Ceramic or Quarry Tile) Yes
9-f Flooring (Polished, Stained, Epoxy, Sealed) Yes - Sealed Flooring
9-k Painting (Interior & Exterior) Yes

10. Specialties
10-b Fire Extinguishers Yes

15. Mechanical
15-a Plumbing Yes - Please Include Replacing Shower Drains/Please Include Concrete Cutting
15-e HVAC Turnkey Yes
15-g Mechanical Testing & Balance Yes

16. Electrical
16-d Electrical Turnkey Yes - Please Include Installing Cable Wireway Throughout Ceiling Areas/Light Fixtures Provided by Owner

SUBWAY SCOPE UPDATE (PLEASE READ):

Please know that per our pre-bid meeting; with the owner on 9/13/24 at 1pm; we are to not bid any subway interior renovation scope of work. Only the game room, storefront and exterior facades will be in this scope of work. We ask that you plan your bids accordingly, if your have any questions, please reach out. Please also see attached document for your information in the dropbox folder titled "Subway Scope of Work Update"