1. Project Description:
The following project consists of new construction of a 5-story, 147 key, 85,507 GSF Marriott hotel
and has a scope that includes but is not limited to Sitework, Site Utilities, Landscaping, Concrete,
Masonry, Structural Steel & Misc. Metals, Wood Framing & Trusses, Millwork, Caulking &
Waterproofing, Roofing, Doors & Hardware, Glazing, EIFS, Drywall, ACT, Flooring, Painting,
Bathroom Specialties, Signage, Swimming Pool, Elevators, Fire Sprinklers, HVAC, Plumbing,
Electrical, Fire Alarm.
Subcontractor’s Pre-Bid Qualification:
Upon receipt of this Invitation to Bid, confirmation of participation shall be sent to Rycon’s
estimating department. Submission and execution of Rycon’s ITB are required for Bid
Consideration.
2. Subcontractor’s Bid Responsibilities:
o By submitting a proposal, the subcontractor acknowledges that it has reviewed all bid documents,
inclusive of plans, addendums, project manuals, specifications, and other applicable documents.
The subcontractor understands the documents and his proposal are in full compliance with bid
documents and all items associated with their trade.
o The bid documents establish a standard of required function, dimension, appearance and quality
for all materials, equipment and construction methodologies for the project. The subcontractor’s
proposal will include such items as specified on the bid documents, with no substitution. Unless
clearly stated on the bid documents, substitutions are not permitted without written approval from
Rycon Construction.
o All RFI’s regarding discrepancies/omission on the bid documents should be sent to Rycon’s
Estimating Department. Subcontractors shall not contact the Architect/Owner without approval
from Rycon Construction.
o Any Addendums issued prior to bid date will become part of the bid documents. Subcontractors
shall review and acknowledge all addenda, and all changes to scope, material, equipment, etc. shall
be included in the proposal.
o Subcontractors shall execute and submit a “Scope of Work – Bid Exhibit”, if provided by Rycon