BIMT Equipment Wash Facility Jacksonville, FL
Status
Bidding Closed
Bid Date | 12/11/24 12:00pm |
Company
Location
2831 Talleyrand Ave Jacksonville, FL 32206
Jacksonville Port Authority (JAXPORT) intends to construct a new covered equipment wash facility on its Blount Island Marine Terminal (BIMT). 1. Demolition and excavation of existing asphalt pavement in the footprint of the building. 2. Excavation of trenches for rerouting utilities, including reinstatement of pavements. 3. Storm drainage system adjustments and improvements (catch basins, manholes). Pipes are expected to remain. 4. New oil water separator including reinstatement of pavements. 5. New pre-engineered metal building (PEMB) with a 40 feet by 60 feet concrete foundation and about 30 feet high for the Equipment Wash Facility. 6. Electrical network to provide power to building electrical equipment, lighting, and outlets. 7. Communication infrastructure for future.