Hanahan Water Treatment Plant Process Control Facility Hanahan, SC
Relocation
Addendum #1
(click to expand/collapse)
Name | Size | ||
14_Settled Water Alternative | 319.5 KB | ||
15_HVAC and Plumbing Sheets | 3.7 MB | ||
16_Structural Wall Thicknesses | 1.7 MB | ||
17_Alum Piping Markups | 1.0 MB |
Addendum #10
(click to expand/collapse)
Exhibit Bs
11344 & 11631 Dewatering Centrifuge and Compressed Air Vendor Exhibit B
14552 Screw Conveyors Exhibit B
Aluminum Doors and Frames Exhibit B
Asphalt Paving Exhibit B
Demolition Exhibit B
Landscaping Exhibit B
Please review and consider in your quote.
11344 & 11631 Dewatering Centrifuge and Compressed Air Vendor Exhibit B
14552 Screw Conveyors Exhibit B
Aluminum Doors and Frames Exhibit B
Asphalt Paving Exhibit B
Demolition Exhibit B
Landscaping Exhibit B
Please review and consider in your quote.
Name | Size | ||
11344 _ 11631 Dewatering Centrifuge and Compressed Air Vendor Exhibit B | 96.7 KB | ||
14552 Screw Conveyors Exhibit B | 99.2 KB | ||
Aluminum Doors and Frames Exhibit B | 117.2 KB | ||
Aphalt Paving Exhibit B | 189.8 KB | ||
Demolition Exhibit B | 91.7 KB | ||
Landscaping Exhibit B | 96.4 KB |
Addendum #2 - Addendum #3
(click to expand/collapse)
Addendum #4
(click to expand/collapse)
Addendum # 4 Contract Attachments, Terms & conditions, Exhibit B and G Contract
Name | Size | ||
1.1 - Contract for Construction | 130.3 KB | ||
1.2 - General Conditions | 417.1 KB | ||
1.3 - Supplemental Conditions | 114.8 KB | ||
1.4 - Additional Supplemental Conditions | 95.2 KB | ||
Attachment 5 - Bid Bond Form | 20.6 KB | ||
Exhibit C - Payment _ Perform Bond (Std. Ex. C PP Rev. 6_2020) | 211.9 KB | ||
Exhibit C - Supply Bond (Std. SB Rev. 6_2020) | 174.0 KB | ||
Exhibit R_Release of Liens _ Claims Rev_092009 v2 | 107.4 KB | ||
EXHIBIT W-1 - Authorized Individual for Signing Certification of Compliance with Wage Laws | 138.1 KB | ||
EXHIBIT W - Certification of Compliance with Wage Laws | 137.4 KB | ||
Prelim Exh. J - 24047W1 - Hanahan | 132.5 KB | ||
Rev 1 Cast in Place Concrete Exhibit B | 145.6 KB | ||
Rev 1 Electrical Exhibit B | 153.5 KB | ||
Rev 1 HVAC Exhibit B | 121.1 KB | ||
Rev 1 Instrumentation and Controls Exhibit B | 136.1 KB | ||
Rev 1 Plumbing Exhibit B | 168.7 KB | ||
Std. SC PO Rev. 5_2023 | 102.5 KB | ||
Std. SC SC Rev. 05_2023 | 161.5 KB |
Addendum #5
(click to expand/collapse)
Please see the following attachment list for addendum # 5.
Exhibit Bs (Bid Package scope of work)
Rev 0.5 Overhead Coiling Door System Exhibit B
Rev 1 Modular Wall System Exhibit B
Rev 1.1 Flooring Exhibit B
Rev 1.1 Masonry Exhibit B
Rev 2 Painting Exhibit B
Exhibit D
Hanahan WTP GMP 1 Exhibit D REV 1
RFI Log
405889_HWTP Phase 2 GMP 1_Live Addenda Log OCT 11
We will keep you updated when we receive B&V answers to the RFIs.
Exhibit Bs (Bid Package scope of work)
Rev 0.5 Overhead Coiling Door System Exhibit B
Rev 1 Modular Wall System Exhibit B
Rev 1.1 Flooring Exhibit B
Rev 1.1 Masonry Exhibit B
Rev 2 Painting Exhibit B
Exhibit D
Hanahan WTP GMP 1 Exhibit D REV 1
RFI Log
405889_HWTP Phase 2 GMP 1_Live Addenda Log OCT 11
We will keep you updated when we receive B&V answers to the RFIs.
Name | Size | ||
405889_HWTP Phase 2 GMP 1_Live Addenda Log OCT 11 | 207.7 KB | ||
Hanahan WTP GMP 1 Exhibit D REV 1 | 163.0 KB | ||
Rev 0.5 Overhead Coiling Door System Exhibit B | 110.5 KB | ||
Rev 1 Modular Wall System Exhibit B | 131.4 KB | ||
Rev 1.1 Flooring Exhibit B | 118.5 KB | ||
Rev 1.1 Masonry Exhibit B | 140.5 KB | ||
Rev 2 Painting Exhibit B | 107.2 KB |
Addendum #6
(click to expand/collapse)
Black & Veatch released addendum # 6, Please see the following attachment list for addendum # 6.
Topographic Survey
24_HGB_Survey_05-13-24
Fuel Oil scope Drawing C1-80-00-502
30_Diesel References
Gibson Hazardous Assessment Report
41_Hanahan WTP Gibson_Hazardous Building Materials Assmt Report
RFI Log - October 14,2024
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 14 - RFI
Topographic Survey
24_HGB_Survey_05-13-24
Fuel Oil scope Drawing C1-80-00-502
30_Diesel References
Gibson Hazardous Assessment Report
41_Hanahan WTP Gibson_Hazardous Building Materials Assmt Report
RFI Log - October 14,2024
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 14 - RFI
Name | Size | ||
24_HGB_Survey_05-13-24 | 1.5 MB | ||
30_Diesel References | 8.9 MB | ||
41_Hanahan WTP Gibson_Hazardous Building Materials Assmt Report | 3.9 MB | ||
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 14 - RFI | 259.6 KB |
Addendum #7
(click to expand/collapse)
Please find attached addendum # 7, See the following attachment list for addendum # 7.
Contract Attachments
21. Exhibit V - Building Information Modelling Requirements
Electrical Equipment Submittals -Preliminary – not approved
SwitchBoard_PRELIM - NOT FINAL
Switchgear_PRELIM - NOT FINAL
RFI Log Dated Oct 18,2024
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 18
RFI 44 Reference Answer_Photo_Reference
RFI 46 Reference Answer_Architectural_Markups
RFI 51 Reference Answer _Sample_Line_Reference
RFI 53 Reference Answ_Gibson RW Tunnel RD_References
Please review and consider in your quote.
Contract Attachments
21. Exhibit V - Building Information Modelling Requirements
Electrical Equipment Submittals -Preliminary – not approved
SwitchBoard_PRELIM - NOT FINAL
Switchgear_PRELIM - NOT FINAL
RFI Log Dated Oct 18,2024
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 18
RFI 44 Reference Answer_Photo_Reference
RFI 46 Reference Answer_Architectural_Markups
RFI 51 Reference Answer _Sample_Line_Reference
RFI 53 Reference Answ_Gibson RW Tunnel RD_References
Please review and consider in your quote.
Addendum #8
(click to expand/collapse)
Please find attached addendum # 8, See the following attachment list for addendum # 8.
Exhibit Bs
Rev 1 Cold Formed Metal Trusses Exhibit B
Rev 1 Deep Foundation Exhibit B
Rev 1 Field Engineering Exhibit B
Rev 1 Mass Excavation Exhibit B
Rev 1 Roofing Exhibit B
Rev 1 Spec 11720 Solids Polymer Feed Systems Exhibit B
Rev 1 Windows Exhibit B
RFI Log Dated Oct 22,2024
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 22
RFI 61 Reference Answer_Stop_Log_Shop_Drawing
RFI 82 Reference Answer_Catwalk Framing Plan_Record Info
Site Logistic Plan
REV 1 Logistics Plan
Please review and consider in your quote.
All attachments are uploaded to the project files under addendum #8.
Thanks
George
Attachments:
REV 1 Logistics Plan.pdf
61_Stop_Log_Shop_Drawing.pdf
82_Catwalk Framing Plan_Record Info.pdf
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 22.pdf
Rev 1 Deep Foundation Exhibit B.pdf
Rev 1 Cold Formed Metal Trusses Exhibit B.pdf
Rev 1 Field Engineering Exhibit B.pdf
Rev 1 Mass Excavation Exhibit B.pdf
Rev 1 Roofing Exhibit B.pdf
Rev 1 Spec 11720 Solids Polymer Feed Systems Exhibit B.pdf
Rev 1 Windows Exhibit B.pdf
Exhibit Bs
Rev 1 Cold Formed Metal Trusses Exhibit B
Rev 1 Deep Foundation Exhibit B
Rev 1 Field Engineering Exhibit B
Rev 1 Mass Excavation Exhibit B
Rev 1 Roofing Exhibit B
Rev 1 Spec 11720 Solids Polymer Feed Systems Exhibit B
Rev 1 Windows Exhibit B
RFI Log Dated Oct 22,2024
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 22
RFI 61 Reference Answer_Stop_Log_Shop_Drawing
RFI 82 Reference Answer_Catwalk Framing Plan_Record Info
Site Logistic Plan
REV 1 Logistics Plan
Please review and consider in your quote.
All attachments are uploaded to the project files under addendum #8.
Thanks
George
Attachments:
REV 1 Logistics Plan.pdf
61_Stop_Log_Shop_Drawing.pdf
82_Catwalk Framing Plan_Record Info.pdf
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 22.pdf
Rev 1 Deep Foundation Exhibit B.pdf
Rev 1 Cold Formed Metal Trusses Exhibit B.pdf
Rev 1 Field Engineering Exhibit B.pdf
Rev 1 Mass Excavation Exhibit B.pdf
Rev 1 Roofing Exhibit B.pdf
Rev 1 Spec 11720 Solids Polymer Feed Systems Exhibit B.pdf
Rev 1 Windows Exhibit B.pdf
Name | Size | ||
61_Stop_Log_Shop_Drawing | 30.7 MB | ||
82_Catwalk Framing Plan_Record Info | 452.4 KB | ||
405889_HWTP Phase 2 GMP 1_Live Addenda Log Oct 22 | 280.2 KB | ||
Rev 1 Cold Formed Metal Trusses Exhibit B | 125.4 KB | ||
Rev 1 Deep Foundation Exhibit B | 121.5 KB | ||
Rev 1 Field Engineering Exhibit B | 115.9 KB | ||
REV 1 Logistics Plan | 2.1 MB | ||
Rev 1 Mass Excavation Exhibit B | 114.8 KB | ||
Rev 1 Roofing Exhibit B | 125.6 KB | ||
Rev 1 Spec 11720 Solids Polymer Feed Systems Exhibit B | 114.2 KB | ||
Rev 1 Windows Exhibit B | 107.9 KB |
Addendum #9
(click to expand/collapse)
See the following attachment list for addendum # 9.
*Exhibit Bs
11160 Progressing Cavity Pump Exhibit B
11185 Submersible Sump and Sewage Pumps Exhibit B
11192 Sample Pumps Exhibit B
11240 & 11451 & 11460 Exhibit B
11259 Sanitary Sewer Pump Station Exhibit B
11318 Grinders Exhibit B
11720 Solids Polymer Feed Systems Exhibit B
11722 Floc Aid Polymer Feed System Exhibit B
Casework Exhibit B
Deep Foundation Exhibit B
Dewatering Exhibit B
Lead and Asbestos Abatement Report Exhibit B
Mass Excavation Exhibit B REV 01
Support of Excavation Exhibit B
Note,
Please consider the updated Exhibit B for Mass Excavation Exhibit B REV 01
Please review and consider in your quote.
*Exhibit Bs
11160 Progressing Cavity Pump Exhibit B
11185 Submersible Sump and Sewage Pumps Exhibit B
11192 Sample Pumps Exhibit B
11240 & 11451 & 11460 Exhibit B
11259 Sanitary Sewer Pump Station Exhibit B
11318 Grinders Exhibit B
11720 Solids Polymer Feed Systems Exhibit B
11722 Floc Aid Polymer Feed System Exhibit B
Casework Exhibit B
Deep Foundation Exhibit B
Dewatering Exhibit B
Lead and Asbestos Abatement Report Exhibit B
Mass Excavation Exhibit B REV 01
Support of Excavation Exhibit B
Note,
Please consider the updated Exhibit B for Mass Excavation Exhibit B REV 01
Please review and consider in your quote.
Name | Size | ||
11160 Progressing Cavity Pump Exhibit B | 94.8 KB | ||
11185 Submersible Sump and Sewage Pumps Exhibit B | 95.4 KB | ||
11192 Sample Pumps Exhibit B | 93.5 KB | ||
11240 _ 11451 _ 11460 Flocculator -Sludge Collection- Inclined Plate Set Exhibit B | 96.1 KB | ||
11259 Sanitary Sewer Pump Station Exhibit B | 95.2 KB | ||
11318 Grinders Exhibit B | 94.8 KB | ||
11720 Solids Polymer Feed Systems Exhibit B | 95.2 KB | ||
11722 Floc Aid Polymer Feed System Exhibit B | 94.1 KB | ||
Casework Exhibit B | 113.6 KB | ||
Deep Foundation Exhibit B | 104.7 KB | ||
Dewatering Exhibit B | 116.2 KB | ||
Lead and Asbestos Abatement Report Exhibit B | 94.8 KB | ||
Mass Excavation Exhibit B REV 01 | 106.3 KB | ||
Support of Excavation Exhibit B | 136.2 KB |
Full Construction Schedule
(click to expand/collapse)
Name | Size | ||
24047W1 - 20241023 - GMP1 Full Construction Schedule | 1.0 MB |
Sales Tax Note
(click to expand/collapse)
For all Subcontractors , Please add the appreciate Sales Tax for Hanahan GMP 1 project as a separate line item in your Quote.